Assembly, Preparing for assembly, Required assembly material – Florabest FKG 48 A1 Benutzerhandbuch
Seite 8: Gb cy
Advertising

5
FKG 48 A1
GB
CY
Assembly
Preparing for assembly
Allow yourself plenty of time for the assembly of the round barbecue. Secure a
level workplace of about two to three square meters. Remove all individual items
from the packaging and place them where they are conveniently handy.
Required assembly material
Phillips head screwdriver
Open-ended spanners SW 8 mm, SW 13 mm
WARNING
►
To avoid possible injury, the screw heads should always face outwards.
First tighten all screw connections down when the assembly is complete,
this will help avoid undesirable material tensions.
IB_86697_FKG48A1_LB7.indb 5
IB_86697_FKG48A1_LB7.indb 5
09.01.13 09:22
09.01.13 09:22
Advertising